ROADWORKS AND ACCESSORIES

Description

USD

   

Roadworks

 

• Preparation of road sub-grade, including leveling and compaction

1.00/m2

• Crushed aggregate base course, 200mm thick including leveling, watering and compaction

3.00/m2

• Bituminous prime coat applied at a rate of 0.75-1.50kg/m2

0.50/m2

• Asphalt wearing course, 50mm thick, including leveling and compaction

4.50/m2

• Precast concrete paving tiles (400mmx400mmx40mm thick) bedded and jointed in cement and sand mortar, including 100mm thick sand bed

11.50/m2

• Precast concrete curb stone (400mmx200mmx180mm high), including excavation, reinforced concrete foundation and control joints

14.00/l-m

   

Pavement marking

 

• Road marking, 200mm wide continuous strip, white color

3.00/l-m

• Ditto, 400mm wide broken line strip

6.00/l-m

• Road marking, thermoplastic paint, 1.5mm thick

11-13/m2

 

 

Identifying and pedestrian-control devices

 

• Traffic sign (area less than 1sq-m) including post, support and all fixings, made of galvanized steel and engineering grade reflective sheeting, complete with concrete foundation

50-80/No

• Ditto, but area exceeding 1sq-m

100-140/m2

• Pavement markers (cat eyes) fixed to pavement floor

4.00/No

• Heavy duty rubber cones, 7.5kg weight

14.00/No